Germany Office Address

Haus A / 1. Etage, Edisonstr. 63, 12459 Berlin

SEVEN ENGINEERING (BERLIN) GLOBAL TECH BHD (1531839-H)
SEVEN ENGINEERING (BERLIN) INNOVATION DESIGN & SERVICES SDN. BHD. (1382685-M)

Office – Level 16, Pavilion Tower, Jalan Raja Chulan, Kuala Lumpur 50200 Malaysia

KL & PJ OPERATION STORE
Section 14, Petaling Jaya, 46100 Malaysia

PENANG & JOHOR OPERATION STORE

Taman Johor Jaya, Johor Bahru, 81100 Johor.

Lorong Nagasari 1, Taman Nagasari, 13600 Pulau Pinang.

TEL: 0329358889 / 014 3200 051

How to Handle Inter-Floor Leakage in a Strata Scheme

Inter-floor leakage is a common and frustrating issue in strata developments. This problem not only disrupts the daily lives of residents but can also lead to significant property damage if not addressed promptly. The timely identification and resolution of inter-floor leakage are essential to prevent further complications and to maintain property value. Residents facing this issue often find themselves in disputes with neighbors, which can lead to prolonged repair processes and legal challenges.

Effective communication and understanding of the management’s role can play a significant part in resolving these disputes. The Strata Management Regulations 2015 provide clear guidelines for managing inter-floor leakage efficiently. In addition to understanding the regulations, seeking professional help can significantly alleviate the stress involved. Seven Engineering Group offers advanced solutions for detecting and repairing inter-floor leakage in your strata property. Call: +6014-3200 051 | Visit: Seven Engineering Group

Water leakages inspection equipment and services.

Steps to Address Inter-Floor Leakage

1. Reporting the Leakage

The first step in addressing inter-floor leakage is reporting the issue to the relevant authority. This could be the developer, joint management body, management corporation, or subsidiary management corporation (referred to as “Management”). It is vital that the affected parcel owner act quickly to notify the appropriate parties to ensure prompt action is undertaken.

2. What Happens After Reporting?

Once the Management receives the notice of leakage, they are obligated to conduct an inspection of the affected parcel, along with other relevant units and common property, within seven days. This inspection is crucial for determining the cause of the leakage and identifying the responsible party. During this process, professional assistance from Seven Engineering Group can facilitate accurate diagnosis and effective repairs, which is essential for a swift resolution.

3. How is Responsibility Determined?

Determining responsibility for inter-floor leakage can sometimes be a complex issue, and the SMR outlines key considerations:

  • Parcel Above or Common Property: Generally, the defect is presumed to originate from the parcel above or from common property unless evidence indicates otherwise.
  • Common Property Defects: Issues with shared utilities such as water meters or pipes that serve multiple parcels are classified as common property defects.
  • Individual Parcel Defects: If the defect is localized to one parcel, it will be considered the responsibility of that parcel owner, regardless of whether the utilities are located in common areas.

What to Expect After Inspection

After the inspection is completed, the Management is required to issue a certificate of inspection (Form 28) within five days. This certificate will detail the cause of the leakage and the party responsible for the required repairs, providing clarity and direction for the next steps.

4. Disagreeing with the Findings

In the event that a parcel owner disagrees with the inspection findings, they have the right to escalate the matter to the Commissioner of Building (COB). The COB will reassess the case, and it is important to note that all parties involved must adhere to the COB’s final decision.

Water leakages inspection equipment and services 1

Seven Engineering Group – Your Trusted Partner

When dealing with inter-floor leakage in strata developments, it can be overwhelming; however, Seven Engineering Group offers a reliable and stress-free solution. Their expert team employs cutting-edge technology, including ultrasound acoustic leak detection, which allows them to accurately pinpoint and repair leaks without causing additional damage to your property. This innovative approach not only saves time but also minimizes the disruption experienced by residents.

To safeguard your strata property against water damage and ensure a safe living environment, contact Seven Engineering Group today!
Call: +6014-3200 051 | Visit: Seven Engineering Group

Refusal to Allow Access

It is imperative for parcel owners to grant access for inspections and repairs. Refusing access after receiving seven days’ written notice constitutes a criminal offense under the SMR. In cases of emergency, where there is an imminent risk of flooding or danger to life, the notice period may be waived, allowing for immediate action to be taken.

No Action Taken?

If no action is taken following the notice provided, the affected parcel owner has legal recourse available. They can initiate legal proceedings or refer the matter to the Strata Management Tribunals for resolution, ensuring that their rights are protected and that action is taken to address the inter-floor leakage.

Water leakages inspection equipment and services 3

Conclusion

The Strata Management Regulations 2015 provide clear procedures for effectively addressing inter-floor leakage issues in strata developments. Parcel owners must adhere to the outlined steps in the SMR, ensuring timely communication and action before seeking external legal assistance. Seven Engineering Group is dedicated to offering comprehensive services that fix leaks quickly and efficiently, taking the stress out of the process for residents.